Chiswick Basement Access
Hung stair access into the basement during ground works for Astute Property in Chiswick.
Safe access into the excavation is one of the first problems on a basement job. At Chiswick, Ozscaf installed hung stairs for Astute Property so crews could get down to the basement level and back out during ground works, before the permanent structure existed to support a conventional stair tower.